Elevated Tank construction at Heeratiya with 150 m3 Capacity
Elevated Tank construction at Heeratiya
Capacity 150 m3
Water Board approval is given on...to start the construction of Heeratiya tank as per the original plan on October 2019
2018/11/13
2018/12/13
2018/12/19
This is the status after 3 months joining the company
Status on 26/02/2019
Column supports are completed
Status on 2019/03/28
Tank first lift has been concreted on 25/03/2019